Author: sheersh
Subject: Reply to: Updating a VSAM file with DISP=OLD
Posted: Wed Mar 15, 2017 4:25 pm (GMT 5.5)
@ UmeySan - thanks. Yes i have considered share levels and mine would be the only jcl updating the file, rests all will be reading it. We do use CA7 and can set up file /resource requirement but that need to be set on all jobs .. while I can easily set it for my new job. there are thousands of jobs which are already in production and not practical to update scheduling for all.
_________________
Thanks,
Sheersh G
Subject: Reply to: Updating a VSAM file with DISP=OLD
Posted: Wed Mar 15, 2017 4:25 pm (GMT 5.5)
@ UmeySan - thanks. Yes i have considered share levels and mine would be the only jcl updating the file, rests all will be reading it. We do use CA7 and can set up file /resource requirement but that need to be set on all jobs .. while I can easily set it for my new job. there are thousands of jobs which are already in production and not practical to update scheduling for all.
_________________
Thanks,
Sheersh G