Author: pahiker
Posted: Tue Sep 27, 2016 8:23 pm (GMT 5.5)
yeah, that's not an option. The file does not originate from programs under our control, so adding the date to the file won't work. The other option would require operator intervention prior to the job running, also not an option.
Posted: Tue Sep 27, 2016 8:23 pm (GMT 5.5)
Rohit Umarjikar wrote: |
Easiest way is, add a Header to the file which contains Creation Date or add another step before Cobol routine executes which puts the creation date into another file and feed that to the Cobol routine. |
yeah, that's not an option. The file does not originate from programs under our control, so adding the date to the file won't work. The other option would require operator intervention prior to the job running, also not an option.